Modern Concrete Sidewalks – Floating Pads

October 11, 2016 by Bob Borson 39 Comments

When you pull up in front of a house, did you know that you can determine if the house is modern even before look up? Just a look at the sidewalk. If the sidewalk is in a continuous pour from the street to the front door, someone didn’t get the Bob Borson memo on modern sidewalks.

Despite the fact that I’ve been designing residential sidewalks for a long time, I’ve don’t think I’ve ever poured an uninterrupted concrete sidewalk that led up to the front door of one of my projects. Instead, I like to pour individual floating pads of concrete to help modify the scale of the approach so that you aren’t walking along a concrete landing strip. So that’s what I thought I would talk about today – how we build concrete sidewalks out of individual pads of concrete.

Site Plan - concrete sidewalk floating pads

The image above is a landscape plan for one of the houses we currently have under construction. We worked with a landscape architect on the layout and planting, but the sidewalk layout is something that we put together in our office from the beginning. One thing that I don’t have to consider too often as a design parameter is accessibility and snow. I’ve personally navigated pads like this in a wheelchair so I know it’s possible without much effort, and the amount of snow we get here doesn’t make shoveling snow an issue.

concrete pads formwork with rebar

This formwork for this entire sidewalk came together in about 3 hours (I think there 15 people on site and working on this single sidewalk). All of this was framed up using 2×4 and 2×6 lumber, 3/4″ stakes, and #3 rebar. *Did you know* The rule of thumb I use on rebar is to multiply each number by 1/8″ … meaning #3 bar is 3 x 1/8″ or 3/8″ thick.

concrete formwork

This is looking down at the formwork that surrounds where two floating pads come together. We generally go for a 4″ max spacing for the gap but more times than not, it is exactly 3 3/4″ wide. This accounts for each 2x framing member with a 3/4″ stake driven in the middle to hold the formwork in place.

concrete pads formwork with rebar

One of the things that we do that might be a little bit different, is that we tie all the floating pads together by tying the rebar from each floating together with its neighbor.  How do we do that? If you look at the picture above, you can see that a small channel has been dug out underneath the formwork and there is a bent piece of rebar that is fed through that channel.

concrete pads formwork with rebar

Here’s a closer look at the steel that has been bent – this is not where it will go, I pulled it out of the channel so I could take this picture.

concrete pad detail

I sketched up a detail to show you better what I am describing. I didn’t draw this detail up for this particular contractor – he and I have worked together long enough that he knows how to execute this particular detail. You can see the dashed lines up above that represent the rebar (which is just short for “reinforcing bar”). Each floating pad has its own rebar in it – you can see where I’ve sketched in the bent rebar that goes under the formwork but comes up high enough that it will tie off to the steel in each concrete pad. The other added benefit of this particular method is that it helps ensure that the concrete doesn’t get pushed down to the bottom of the sidewalk, rendering it useless.

I will go ahead and state the obvious … the steel rebar that is exposed in the ground will eventually rust and  that rust will migrate its way into the concrete. This is not a detail I would use in many parts of the country, and depending upon the environmental elements, the rate at which the rust occurs will vary. As it is, it will take a very long time for this mild steel to rust and become a problem here in Dallas.

Of course, you don’t have to tie the pads together – we just do it so that over the next few years as the construction settles, the concrete pads will move in unison.

concrete pads formwork

We have a few grade changes in our sidewalk and when that occurs, the edge of the concrete thickens to make up the difference in the grade change. The picture above is what the step looks like in the formwork. If you look closely, you can see how the top 2×6 boards are sitting on top of another 2×6 board that is tapered

concrete formwork - floating sidewalk pads

Here is another view of the formwork used to create the step.

concrete pads plan view

Fast forward a few days and the concrete has been poured, and cured enough that they have removed all the formwork. The other thing that has been done is that all the concrete has been acid-washed. We generally do not want to see broom-finished concrete (a process of creating surface texture on the concrete by literally dragging a broom across the surface while the concrete is still setting). We typically like to see acid-washed concrete because of the consistent clean finish you get as a result. I did not see how this surface was etched but most of the time I see the concrete contractors using muriatic acid mix in a 4 parts water to 1 part muriatic acid.

concrete sidewalk - floating pads

Here’s a look at the finished concrete pads leading up to the front door.

concrete sidewalk - floating pads

The site has not even been rough graded yet but eventually the surrounding dirt will be set about 2″ below the top of the concrete

concrete sidewalk - floating pads

concrete sidewalk - floating pads

concrete sidewalk - floating pads

I will admit that I have never drawn this detail in my life, and the first time I ever saw it done this way was probably 10 years ago when I was working on a project with a Dallas Landscape Architect Kelly James – a great guy who passed away in 2006. Over the years I have kept my eyes open for a better way to detail these floating pads and have yet to see one. If you have any tips of tricks, feel free to share them with me.

Cheers,

Bob-AIA scale figure

 

 

even better stuff from Life of an Architect

How much money does an architect make?

The BSB Cabin - A Trip to the Frozen North

How Much Do Architects Actually Work?

Japanese Playhouse in New Zealand

Modern Trellis / Brise Soleil

A Day in the Life of an Architect

T-Shirts for Architects

Renzo Piano Kimbell Art Museum Sneak Peek

If I have to tell you everything ...
Modern Steel Trellis

Share this:

  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on X (Opens in new window) X
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on WhatsApp (Opens in new window) WhatsApp
  • Click to email a link to a friend (Opens in new window) Email
  • Click to print (Opens in new window) Print

Filed Under: Construction, Design, Modern House, Residential Tagged With: Construction Observation, Construction Process, details, Materials, modern house

Search Life of an Architect

Subscribe to Podcast

Apple PodcastsSpotifyAndroidiHeartRadioby EmailTuneInRSS

Subscribe to our mailing list

* indicates required

Apparel for Architects

T-Shirts for Architects - Bob Borson

Support for Advice or Guidance - or if you simply want to show appreciation for the content produced on this site

Thanks!
Other Amount
Project Reference or Support for Questions Answered:

Trending on Life of an Architect

Ten Cathedrals to see before you die
Architectural Graphics 101 - Symbols
Architectural Graphics 101: Cover Sheet
Architectural Graphics 101 - Reflected Ceiling Plans
Architectural Graphics 101: Finish Schedules
Architectural Graphics 101 - Window Schedules
Do you want to be an Architect?
Architectural Graphics 101 - Wall Types
Architectural Graphics 101 - Layers
Ep 177: Hanging Out Your Shingle

My “Serious” Disclaimer

The complimentary advice provided on ‘Life of an Architect’ is based on an abbreviated examination of the minimal facts given, not the typical extensive (and sometimes exhaustive) analysis I conduct when working with my clients. Therefore, anything you read on this site is not a substitute for actually working with me. Following my casual advice is at your own peril … if you want my undivided attention, I would recommend hiring me. Cheers.

Pages

  • Comment Policy
  • Privacy Policy
  • Architecture Books+
  • about me
  • Questions?
  • F. A. Q.
  • Do you want to be an Architect?
  • Podcast

Life of an Architect | Bob Borson

  • Facebook
  • Twitter
  • Instagram
  • LinkedIn

Archives of Awesomeness

Copyright © 2025 Life of an Architect

 

Loading Comments...